YEAR
COMPANY
LOCATION
DESCRIPTION
2020-2021
![CameronLogo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CameronLogo.jpg)
![PEMEX CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/PEMEX.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP TETL-1001 Platform (SIT Project)
Design, construction and commissioning of a Well Head Control Panel (TSCP / WHCP) – SIT Project for PEMEX’s TETL-1001 Platform with Control for 03 Pneumatic Valves: MV, WVA and WVB; Control for 01 Hydraulic Valve: SCSSV; Local ESD button; 01 Remote ESD 24VDC Solenoid Valve.
2020-2021
![CameronLogo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CameronLogo.jpg)
![PEMEX CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/PEMEX.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP POKCHÉ-2Del Platform (SIT Project)
Design, construction and commissioning of a Well Head Control Panel (TSCP / WHCP) – SIT Project for PEMEX’s POKCHÉ-2Del Platform with Control for 03 Pneumatic Valves: MV, WVA and WVB; Control for 01 Hydraulic Valve: SCSSV; Local ESD button; 01 Remote ESD 24VDC Solenoid Valve.
2020-2021
![CameronLogo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CameronLogo.jpg)
![PEMEX CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/PEMEX.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP POKCHÉ-1Del Platform (SIT Project)
Design, construction and commissioning of a Well Head Control Panel (TSCP / WHCP) – SIT Project for PEMEX’s POKCHÉ-1Del Platform with Control for 03 Pneumatic Valves: MV, WVA and WVB; Control for 01 Hydraulic Valve: SCSSV; Local ESD button; 01 Remote ESD 24VDC Solenoid Valve.
2020-2021
![CameronLogo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CameronLogo.jpg)
![COMMSA CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/COMMSA.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP POKCHÉ-C (ONEL-B 15K PSI Upgrade)
Re-design, adjustment and commissioning of ONEL-B’s Platform Well Head Control Panel (TSCP / WHCP) for PEMEX’s POKCHÉ-C Platform with 9 Oil Production Spaces, 4 with instrumented modules at 15k PSI.
2019-2021
![unnamed CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/unnamed.png)
![Eni Logo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/Eni-Logo.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP Área 1 México-AMOCA WHP1
Design, construction and commissioning of a Well Control Control Panel (TSCP / WHCP) for Area 1 of Mexico AMOCA WHP1 with 10 Spaces for Oil Production, 8 with instrumented modules and 5 Spaces for Water Injection, 4 with instrumented modules.
2019-2020
![CameronLogo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CameronLogo.jpg)
![COMMSA CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/COMMSA.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP ONEL-B Platform
Design, construction and commissioning of a Well Head Control Panel (TSCP / WHCP) for PEMEX’s ONEL-B Platform with 9 Oil Production Spaces, 4 with instrumented modules.
2019-2020
![CameronLogo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CameronLogo.jpg)
![Cotemar-300x225 CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/Cotemar-300x225-1.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP YAXCHÉ-C Platform
Design, construction and commissioning of a Well Head Control Panel (TSCP / WHCP) for PEMEX’s YAXCHÉ-C Platform with 9 Spaces for Oil Production and 9 instrumented modules.
2019-2020
![CameronLogo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CameronLogo.jpg)
![d73d6e_7eaf239d124d4fbd876176f10cbf426a_mv2 CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/d73d6e_7eaf239d124d4fbd876176f10cbf426a_mv2.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP Hokchi Satellite Platform
Design, construction and commissioning of a Well Head Control Panel (TSCP / WHCP) for the HOKCHI ENERGY SATELLITE Platform with 6 Spaces for Oil Production, 4 with instrumented modules: 2 for Production and 2 for Water Injection.
2019-2020
![CameronLogo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CameronLogo.jpg)
![d73d6e_7eaf239d124d4fbd876176f10cbf426a_mv2 CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/d73d6e_7eaf239d124d4fbd876176f10cbf426a_mv2.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP Hokchi Central Platform
Design, construction and commissioning of a Well Head Control Panel (TSCP / WHCP) for the HOKCHI ENERGY CENTRAL Platform with 13 Spaces for Oil Production, 10 with instrumented modules: 5 for Production and 5 for Water Injection.
2018-2019
![images CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/images.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
Second Level Supervision Service
During the execution of the activities related to electromechanical work, process interconnections and security systems on shallow water platforms in the “Sonda de Campeche, Mexico”, the Project Management Office (PMO) was implemented as administrative and technical support during the execution of the activities, basing this service on the best international practices for project management, in accordance with the 05 Process Areas and the 10 Areas of Knowledge, as established in the “Guide to the Project Management Body Of Knowledge” (PMBOK), issued by the Project Management Institute (PMI).
Based on this Project Management Guide (PMBOK), the following plans were developed and implemented in the project:
• Stakeholder management plan,
• Communications management plan,
• Schedule management plan (Critical Path and Earned Value),
• Project risk analysis management plan and
• Knowledge transfer.
Based on these plans and the analysis of the project information, which were generated during the execution of the works in the manufacturing yards, as well as in the Off-Shore facilities, weekly and monthly reports were issued in where the trends and projections of the completion dates of each of the project phases were integrated, as well as the project risk analysis report.
This information was used by the stakeholders for decision-making and action-taking in order to mitigate deviations in each of the important milestones of the project, ensuring with this the success of the project.
2015-2016
![CTQ_Clientes_Logo_RuhRPumpen CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_RuhRPumpen-.jpg)
Ecuador
RUHR-PUMPEN (Petro Ecuador)
Design and construction of 15 pump control enclosure for the pipe line Cuenca-Pascuales in Ecuador.
Commissioning & Start-Up of the pumps skids using Contrologix and Panel View Rockwell Automation.
2012-2015
![CTQ_Clientes_Logo_Cameron CTQ, Cameron, Comisionamiento y puesta en marcha de turbo compresores para gas natural / projects CTQ, Commissioning and implementation of natural gas turbo compressors](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Cameron.jpg)
![CTQ_Clientes_Logo_GE CTQ, General Electric, GE, recepción e integración del Switchgear](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_GE-1.jpg)
![CTQ_Clientes_Logo_PDVSA CTQ, PDVSA, Comisionamiento de instrumentación de compresores, BOP / projects CTQ, Compressor instruments commissioning, BOP](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_PDVSA.jpg)
Guere, Anzoategui Venezuela
CAMERON / GE-PDVSA
Supervision and management of suppliers in the construction of the fourth gas compressor control station of 60MMSCF, reception and integration of Switchgear, MCC, fire protection system, programming and start-up of the process server central (PSC), Safety Instrument System (SIS), Fire and Gas safety system (F&G) and suppression with water, instruments commissioning and implementation in plant.
Compressor instruments (6) commissioning service and complementing equipment (BOP) to the compressor facility.
2015
![CTQ_Clientes_Logo_Cameron CTQ, Cameron, Comisionamiento y puesta en marcha de turbo compresores para gas natural / projects CTQ, Commissioning and implementation of natural gas turbo compressors](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Cameron.jpg)
Orla, Texas
CAMERON-Nuevo , Midstream Ramsey, Plant-NGL Recovery Plants
HMI engineer service (Wonderware) and PLC (Contrologix) for the automation of the facility. Commissioning services to the facility’s instruments.
2015-2016
![CTQ_Clientes_Logo_Intech CTQ, INTECH, Servicio de comisionamiento y puesta en marcha / projects CTQ, Commissioning service and start-up](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Intech.jpg)
![CTQ_Clientes_Logo_Neuman CTQ, NEUMAN & ESSER, Servicios de comisionamiento y puesta en marcha de compresores reciprocantes / projects CTQ, Commissioning service and implementation of reciprocate compressors](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Neuman.jpg)
PEMEX
INTECH-NEUMAN
Commissioning service and implementation of reciprocate compressors (Hydrogen).
2014-2015
![CTQ_Clientes_Logo_Oxy CTQ, OXY, Servicios de comisionamiento y “Troubleshooting / projects CTQ, Commissioning service and troubleshooting.](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Oxy.jpg)
North Dakota, USA
OXY
Commissioning service and troubleshooting.
2014
![CTQ_Clientes_Logo_Cameron CTQ, Cameron, Comisionamiento y puesta en marcha de turbo compresores para gas natural / projects CTQ, Commissioning and implementation of natural gas turbo compressors](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Cameron.jpg)
Urucu-Brasil
CAMERON-URUCU
Commissioning and implementation of natural gas turbo compressors.
2013-2015
![CTQ_Clientes_Logo_Colfax CTQ, Colfax, Automatización Patines de lubricación / projects CTQ, Automated Lubrication Skids](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Colfax.jpg)
![CTQ_Clientes_Logo_Sicelub CTQ, SICELUB LUBRITECH, proyectos CTQ, automatización patines / projects CTQ, Automated Lubrication Skids](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Sicelub.jpg)
PEMEX
COLFAX-SICELUB
Automated Lubrication Skids SKID-API614.
2012
![CTQ_Clientes_Logo_Intech CTQ, INTECH, Servicio de comisionamiento y puesta en marcha / projects CTQ, Commissioning service and start-up](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Intech.jpg)
Kizomba B FPSO
INTECH
Commissioning service and start-up.
2010
![CTQ_Clientes_Logo_Pemex CTQ, PEMEX, Actualización del Análisis de Riesgo e Impacto Ambiental / projects CTQ, Risks Analysis updates and environmental impact](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Pemex.jpg)
PEMEX Refinación Zona Norte
PEMEX Refining-UANL
Risks Analysis updates and environmental impact to 8 storage terminals and distribution of fuels (TADs) and the pipe line in the north zone.
2010
![CTQ_Clientes_Logo_GobiernoNL CTQ, Proyectos CTQ, Gobierno Del Estado de Nuevo León, suministro de fibra óptica / CTQ Projects, supply optimized fiber](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_GobiernoNL.jpg)
Monterrey, Nuevo León
State Government of Nuevo León
15 km Supply optimized fiber for a 10 GB. (OM3) for the security project of the State of Nuevo Leon.
2009
![CTQ_Clientes_Logo_PDVSA CTQ, PDVSA, Comisionamiento de instrumentación de compresores, BOP / projects CTQ, Compressor instruments commissioning, BOP](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_PDVSA.jpg)
Refinería El Palito, Venezuela
HAMWORTHY-PDVSA
Implementation of Burner Management system in Rockwell Contrologix Architecture.
2009
![CTQ_Clientes_Logo_Optima CTQ, Proyectos CTQ, Optima energía, sistema de monitoreo / CTQ ProjectsDesign, Program and Implementation of monitoring and report system](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Optima.jpg)
México
OPTIMA ENERGÍA
Design, Program and Implementation of monitoring and report system of operative variables of 24 distributed machinery rooms in states as Baja California, Quintana Roo, Guerrero and Oaxaca to the central in Monterrey, N.L.
2007
![CTQ_Clientes_Logo_Pemex CTQ, PEMEX, Actualización del Análisis de Riesgo e Impacto Ambiental / projects CTQ, Risks Analysis updates and environmental impact](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Pemex.jpg)
KU-H&ZAAP-C
BAY-INELECTRA PEMEX
Control and Power enclosures construction for KU-H&ZAAP-C
2002
![CTQ_Clientes_Logo_Honeywell CTQ, HONEYWELL, Desarrollo de Ingeniería de control de procesos para plataformas marinas / projects CTQ, Process Control engineer development for marine platforms](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Honeywell.jpg)
PEMEX Cantarel
HONEYWELL
Process Control engineer development for marine platforms with TPS Honeywell control equipment.
2020-2021
![CameronLogo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CameronLogo.jpg)
![PEMEX CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/PEMEX.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP TETL-1001 Platform (SIT Project)
Design, construction and commissioning of a Well Head Control Panel (TSCP / WHCP) – SIT Project for PEMEX’s TETL-1001 Platform with Control for 03 Pneumatic Valves: MV, WVA and WVB; Control for 01 Hydraulic Valve: SCSSV; Local ESD button; 01 Remote ESD 24VDC Solenoid Valve.
2020-2021
![CameronLogo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CameronLogo.jpg)
![PEMEX CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/PEMEX.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP POKCHÉ-2Del Platform (SIT Project)
Design, construction and commissioning of a Well Head Control Panel (TSCP / WHCP) – SIT Project for PEMEX’s POKCHÉ-2Del Platform with Control for 03 Pneumatic Valves: MV, WVA and WVB; Control for 01 Hydraulic Valve: SCSSV; Local ESD button; 01 Remote ESD 24VDC Solenoid Valve.
2020-2021
![CameronLogo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CameronLogo.jpg)
![PEMEX CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/PEMEX.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP POKCHÉ-1Del Platform (SIT Project)
Design, construction and commissioning of a Well Head Control Panel (TSCP / WHCP) – SIT Project for PEMEX’s POKCHÉ-1Del Platform with Control for 03 Pneumatic Valves: MV, WVA and WVB; Control for 01 Hydraulic Valve: SCSSV; Local ESD button; 01 Remote ESD 24VDC Solenoid Valve.
2020-2021
![CameronLogo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CameronLogo.jpg)
![COMMSA CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/COMMSA.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP POKCHÉ-C (ONEL-B 15K PSI Upgrade)
Re-design, adjustment and commissioning of ONEL-B’s Platform Well Head Control Panel (TSCP / WHCP) for PEMEX’s POKCHÉ-C Platform with 9 Oil Production Spaces, 4 with instrumented modules at 15k PSI.
2019-2021
![unnamed CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/unnamed.png)
![Eni Logo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/Eni-Logo.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP Área 1 México-AMOCA WHP1
Design, construction and commissioning of a Well Control Control Panel (TSCP / WHCP) for Area 1 of Mexico AMOCA WHP1 with 10 Spaces for Oil Production, 8 with instrumented modules and 5 Spaces for Water Injection, 4 with instrumented modules.
2019-2020
![CameronLogo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CameronLogo.jpg)
![COMMSA CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/COMMSA.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP ONEL-B Platform
Design, construction and commissioning of a Well Head Control Panel (TSCP / WHCP) for PEMEX’s ONEL-B Platform with 9 Oil Production Spaces, 4 with instrumented modules.
2019-2020
![CameronLogo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CameronLogo.jpg)
![Cotemar-300x225 CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/Cotemar-300x225-1.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP YAXCHÉ-C Platform
Design, construction and commissioning of a Well Head Control Panel (TSCP / WHCP) for PEMEX’s YAXCHÉ-C Platform with 9 Spaces for Oil Production and 9 instrumented modules.
2019-2020
![CameronLogo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CameronLogo.jpg)
![d73d6e_7eaf239d124d4fbd876176f10cbf426a_mv2 CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/d73d6e_7eaf239d124d4fbd876176f10cbf426a_mv2.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP Hokchi Satellite Platform
Design, construction and commissioning of a Well Head Control Panel (TSCP / WHCP) for the HOKCHI ENERGY SATELLITE Platform with 6 Spaces for Oil Production, 4 with instrumented modules: 2 for Production and 2 for Water Injection.
2019-2020
![CameronLogo CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CameronLogo.jpg)
![d73d6e_7eaf239d124d4fbd876176f10cbf426a_mv2 CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/d73d6e_7eaf239d124d4fbd876176f10cbf426a_mv2.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
TSCP/ WHCP Hokchi Central Platform
Design, construction and commissioning of a Well Head Control Panel (TSCP / WHCP) for the HOKCHI ENERGY CENTRAL Platform with 13 Spaces for Oil Production, 10 with instrumented modules: 5 for Production and 5 for Water Injection.
2018-2019
![images CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/images.png)
Platforms Area Sonda de Campeche, Gulf of Mexico
Second Level Supervision Service
During the execution of the activities related to electromechanical work, process interconnections and security systems on shallow water platforms in the “Sonda de Campeche, Mexico”, the Project Management Office (PMO) was implemented as administrative and technical support during the execution of the activities, basing this service on the best international practices for project management, in accordance with the 05 Process Areas and the 10 Areas of Knowledge, as established in the “Guide to the Project Management Body Of Knowledge” (PMBOK), issued by the Project Management Institute (PMI).
Based on this Project Management Guide (PMBOK), the following plans were developed and implemented in the project:
• Stakeholder management plan,
• Communications management plan,
• Schedule management plan (Critical Path and Earned Value),
• Project risk analysis management plan and
• Knowledge transfer.
Based on these plans and the analysis of the project information, which were generated during the execution of the works in the manufacturing yards, as well as in the Off-Shore facilities, weekly and monthly reports were issued in where the trends and projections of the completion dates of each of the project phases were integrated, as well as the project risk analysis report.
This information was used by the stakeholders for decision-making and action-taking in order to mitigate deviations in each of the important milestones of the project, ensuring with this the success of the project.
2015-2016
![CTQ_Clientes_Logo_RuhRPumpen CTQ, RUHPUMPEN, comisionamiento y puesto en marcha, petro ecuador / projects CTQ, Commissioning & Start-Up](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_RuhRPumpen-.jpg)
Ecuador
RUHR-PUMPEN (Petro Ecuador)
Design and construction of 15 pump control enclosure for the pipe line Cuenca-Pascuales in Ecuador.
Commissioning & Start-Up of the pumps skids using Contrologix and Panel View Rockwell Automation.
2012-2015
![CTQ_Clientes_Logo_Cameron CTQ, Cameron, Comisionamiento y puesta en marcha de turbo compresores para gas natural / projects CTQ, Commissioning and implementation of natural gas turbo compressors](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Cameron.jpg)
![CTQ_Clientes_Logo_GE CTQ, General Electric, GE, recepción e integración del Switchgear](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_GE-1.jpg)
![CTQ_Clientes_Logo_PDVSA CTQ, PDVSA, Comisionamiento de instrumentación de compresores, BOP / projects CTQ, Compressor instruments commissioning, BOP](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_PDVSA.jpg)
Guere,
Anzoategui
Venezuela
CAMERON / GE-PDVSA
Supervision and management of suppliers in the construction of the fourth gas compressor control station of 60MMSCF, reception and integration of Switchgear, MCC, fire protection system, programming and start-up of the process server central (PSC), Safety Instrument System (SIS), Fire and Gas safety system (F&G) and suppression with water, instruments commissioning and implementation in plant.
Compressor instruments (6) commissioning service and complementing equipment (BOP) to the compressor facility.
2015
![CTQ_Clientes_Logo_Cameron CTQ, Cameron, Comisionamiento y puesta en marcha de turbo compresores para gas natural / projects CTQ, Commissioning and implementation of natural gas turbo compressors](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Cameron.jpg)
Orla, Texas
CAMERON-Nuevo , Midstream Ramsey, Plant-NGL Recovery Plants
HMI engineer service (Wonderware) and PLC (Contrologix) for the automation of the facility. Commissioning services to the facility’s instruments.
2015-2016
![CTQ_Clientes_Logo_Intech CTQ, INTECH, Servicio de comisionamiento y puesta en marcha / projects CTQ, Commissioning service and start-up](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Intech.jpg)
![CTQ_Clientes_Logo_Neuman CTQ, NEUMAN & ESSER, Servicios de comisionamiento y puesta en marcha de compresores reciprocantes / projects CTQ, Commissioning service and implementation of reciprocate compressors](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Neuman.jpg)
PEMEX
INTECH-NEUMAN
Commissioning service and implementation of reciprocate compressors (Hydrogen).
2014-2015
![CTQ_Clientes_Logo_Oxy CTQ, OXY, Servicios de comisionamiento y “Troubleshooting / projects CTQ, Commissioning service and troubleshooting.](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Oxy.jpg)
North Dakota,
USA
OXY
Commissioning service and troubleshooting.
2014
![CTQ_Clientes_Logo_Cameron CTQ, Cameron, Comisionamiento y puesta en marcha de turbo compresores para gas natural / projects CTQ, Commissioning and implementation of natural gas turbo compressors](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Cameron.jpg)
Urucu-Brasil
CAMERON-URUCU
Commissioning and implementation of natural gas turbo compressors.
2013-2015
![CTQ_Clientes_Logo_Colfax CTQ, Colfax, Automatización Patines de lubricación / projects CTQ, Automated Lubrication Skids](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Colfax.jpg)
![CTQ_Clientes_Logo_Sicelub CTQ, SICELUB LUBRITECH, proyectos CTQ, automatización patines / projects CTQ, Automated Lubrication Skids](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Sicelub.jpg)
PEMEX
COLFAX-SICELUB
Automated Lubrication Skids SKID-API614.
2012
![CTQ_Clientes_Logo_Intech CTQ, INTECH, Servicio de comisionamiento y puesta en marcha / projects CTQ, Commissioning service and start-up](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Intech.jpg)
Kizomba B
FPSO
INTECH
Commissioning service and start-up.
2010
![CTQ_Clientes_Logo_Pemex CTQ, PEMEX, Actualización del Análisis de Riesgo e Impacto Ambiental / projects CTQ, Risks Analysis updates and environmental impact](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Pemex.jpg)
PEMEX Refinación
Zona Norte
PEMEX Refining-UANL
Risks Analysis updates and environmental impact to 8 storage terminals and distribution of fuels (TADs) and the pipe line in the north zone.
2010
![CTQ_Clientes_Logo_GobiernoNL CTQ, Proyectos CTQ, Gobierno Del Estado de Nuevo León, suministro de fibra óptica / CTQ Projects, supply optimized fiber](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_GobiernoNL.jpg)
Monterrey, Nuevo León
State Government of Nuevo León
15 km Supply optimized fiber for a 10 GB. (OM3) for the security project of the State of Nuevo Leon.
2009
![CTQ_Clientes_Logo_PDVSA CTQ, PDVSA, Comisionamiento de instrumentación de compresores, BOP / projects CTQ, Compressor instruments commissioning, BOP](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_PDVSA.jpg)
Refinery El Palito,
Venezuela
HAMWORTHY-PDVSA
Implementation of Burner Management system in Rockwell Contrologix Architecture.
2009
![CTQ_Clientes_Logo_Optima CTQ, Proyectos CTQ, Optima energía, sistema de monitoreo / CTQ ProjectsDesign, Program and Implementation of monitoring and report system](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Optima.jpg)
México
OPTIMA ENERGÍA
Design, Program and Implementation of monitoring and report system of operative variables of 24 distributed machinery rooms in states as Baja California, Quintana Roo, Guerrero and Oaxaca to the central in Monterrey, N.L.
2007
![CTQ_Clientes_Logo_Pemex CTQ, PEMEX, Actualización del Análisis de Riesgo e Impacto Ambiental / projects CTQ, Risks Analysis updates and environmental impact](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Pemex.jpg)
KU-H&ZAAP-C
BAY-INELECTRA PEMEX
Control and Power enclosures construction for KU-H&ZAAP-C.
2002
![CTQ_Clientes_Logo_Honeywell CTQ, HONEYWELL, Desarrollo de Ingeniería de control de procesos para plataformas marinas / projects CTQ, Process Control engineer development for marine platforms](https://www.ctq.com.mx/wp-content/uploads/CTQ_Clientes_Logo_Honeywell.jpg)
PEMEX Cantarel
HONEYWELL
Process Control engineer development for marine platforms with TPS Honeywell control equipment.